Development and Ranking of Safety Performance Indicators Using Bayesian Network and Analysis Hierarchical Process: Case of Work at Height of the Oil and Gas Refinery Construction Phase



Falahati M1 ; Karimi A2 ; Zakaei M1
Authors
Show Affiliations
Authors Affiliations
  1. 1. Saveh Universty of Medical Scences, Social Determinats of Health Research Center, Saveh University of Medical Sciences, Saveh, Iran
  2. 2. Occupational Health Engineering, Faculty of Public Health, Tehran University of Medical Sciences, Tehran, Iran

Source: Iran Occupational Health Published:2018

Abstract

Background and aims: The safety and health performance measurement, designed to provide the necessary information on the concern to progress and the current state of the organization's strategies, processes and activities. The purpose of this study is to present a new model for the development of safety performance indicators using the probability risk assessment model and applying experts' opinions. Methods: This descriptive-analytic study was carried out in 3 steps: Categorize of the construction face activities and its related hazards identification; formation of the accident causal network occurred in the oil and gas refinery construction phase using the Bayesian network and the selection of key performance indicators using AHP method. Results: The statistical analysis of the recorded accidents showed that 21% of the incidence rate is related to the falling. Among all the construction phase activities, using the WBS analysis of the project, 27 activities with work at height risk of were identified. 18 active performance indicators were extracted the accident causal network that using SMART criteria and occurrence probability rate Calculated from the Bayesian network was selected as 5 active key performance indicators. Conclusion: Determining the leading performance indicators is influenced by various organizational, managerial, operational and other factors. As the project progresses, the nature and level of risk of the operation of construction projects is changing. Therefore, indicators of safety performance measurements in these projects should be sensitive to rapid changes. For this reason, active indicators with a short-term measurement period are more effective in measuring the safety performance of construction operations. © 2018 Tehran University of Medical Sciences and Health Services. All rights reserved.